The City of St. Catharines will be undertaking rehabilitation of the Pelham Road Bridge at the CN Rail Corridor, with construction tentatively scheduled to begin Aug. 21, 2020. Construction should take approximately four months. Details of the project are outlined below.
Project Number: P17-123
Construction Area |
The construction area includes:
|
Project Contacts |
Consultant ContactArish Struger-Kalkman, P. EngProject Manager Ellis Engineering 214 Martindale Rd. St. Catharines, ON L2S 0B2 Phone: 905.934.9049 Email: arih.sk@ellis.on.ca City ContactJim Stranges, C.E.T. |
What We're Doing |
The proposed project includes:
|
Traffic and Property Impacts |
This work is tentatively scheduled to start on August 21, 2020, and in order to complete the rehabilitation of the Pelham Road Bridge safely and in a timely manner:
The City of St. Catharines recognizes that construction is an inconvenience to residents and business owners. Every effort will be made to minimize any inconvenience to local residents and to carry out the work with as few interruptions to services as possible. We thank-you for your patience. Your cooperation will be greatly appreciated. |
Accessibility |
Every effort will be made to maintain access to abutting properties and to minimize inconvenience to businesses, residents and pedestrians. A construction inspector, from Ellis Engineering, will be present on-site during construction and can be contacted for information. |